Productioninjection molding.
ISO-certified plastic injection molding with domestic and international capacity. Engineer-reviewed quotes, 12-point DFM, real shops you can audit.
, Engineer reviewed, 1 business day reply
, 4 processes under one roof

Trusted by engineering teams at
Built for production.
Not for resale.
One engineering team across prototype, bridge, and production tooling. Same shop, same people, no handoffs.
- 01CapacityRead
28T to 1200T press, both flags
Prototype MUD tools in 10 days. Production SPI tools rated to 1M+ shots. Domestic capacity in Benicia, CA. International in Dongguan.
- 02EngineeringRead
12-point DFM review on every program
Resin selection, gate scheme, draft, wall thickness, ejection, venting, weld lines, warpage. All reviewed and documented before steel is cut.
- 03QualityRead
ISO 9001 and 13485 certified
PPAP, APQP, ISIR/FAI, and AS9102B documentation standard on production programs. CMM inspection and full dimensional reports on every run.
- 40+
- IM Machines
- 75+
- CNC Machines
- 140+
- 3D Printers
- 20+
- Engineers
- 2
- Facilities
Full-service
manufacturing.

Injection Molding
Prototype through production tooling. 28T to 1200T press capacity.
Lead Time
Tooling in as fast as 10 days
View
CNC Machining
3-axis to 5-axis. Plastics and metals. Domestic and overseas.
Parts in as fast as 3 days

3D Printing
MJF, SLS, FDM, SLA, DMLS. 140+ machines across technologies.
Parts in as fast as 3 days

Urethane Casting
Silicone tooling, cast polyurethane resins. ±0.010" tolerance.
Parts in as fast as 10 days
Time-to-market,
kept.
We build injection molding tools faithful to their technical design. Prototype MUD through SPI production tooling, 28T to 1200T press capacity, domestic and overseas.
- Prototype tooling
- 10 days. 100 to 5,000 units. MUD frames.
- Bridge tooling
- 20 to 45 days. 5,000 to 20,000 units.
- Production tooling
- 45 to 80 days. 20,000 to 1M+ units. SPI standard.

