
Prototype to production.
Prototype tools in as fast as 10 days. Production presses to 510T domestic, 1200T overseas. The same team carries your part from first article to full rate.
Engineer reviewed, reply in 1-2 business days
- Export Control
- ITAR-adjacent, US-only
- First Articles
- AS9102B
- Certifications
- ISO 9001 / 13485
Trusted by engineering teams at
Five ways
to go faster.

Injection Molding
Prototype through production tooling. 28T to 1200T press capacity.
Lead Time
Tooling in as fast as 10 days
View
CNC Machining
3-axis to 5-axis. Plastics and metals. Domestic and overseas.
Parts in as fast as 3 days

3D Printing
MJF, SLS, FDM, SLA, DMLS. Five additive technologies in one queue.
Parts in as fast as 3 days

Urethane Casting
Silicone tooling, cast polyurethane resins. ±0.010" tolerance.
Parts in as fast as 10 days

Sheet Metal
Stamping, laser cutting, brake forming. Brackets, enclosures, panels.
Parts in as fast as 5 days
Why programs route through Glide.
Aerospace and defense programs live or die on three things: schedule, engineering, and documentation. We built the shop around all three, and medical and consumer programs get the same treatment.
- 01SpeedRead
Tools in 10 days. Parts in 3.
Prototype MUD tools in as fast as 10 days, CNC and printed parts in 3. Presses from 28T to 510T domestic and up to 1200T overseas, so your program never waits in a queue.
- 02EngineeringRead
12-point DFM review on every program
Resin selection, gate scheme, draft, wall thickness, ejection, venting. Overnight feedback, so cost and timeline problems get solved before they cost you weeks.
- 03QualityRead
ISO 9001 and 13485 certified
PPAP, APQP, ISIR/FAI, and AS9102B documentation standard on production programs. ITAR-adjacent: export-controlled work routes through ITAR-registered facilities in our US network.
